How to Use This Assessment
Score your organization on a 1–5 scale for each dimension using the rubrics below. A score of 1 indicates critical gaps; 5 indicates full readiness. Sum scores for a total out of 35.
Complete this assessment with input from application owners, infrastructure teams, security, finance, and business leadership. Single-perspective assessments consistently miss gaps in areas outside the respondent's expertise.
Dimension 1: Application Portfolio
Scoring Rubric
- 1 — Unknown: No application inventory. Dependencies unknown. No assessment of cloud suitability.
- 2 — Partial: Partial application inventory. Some dependencies mapped. Limited cloud suitability assessment.
- 3 — Assessed: Complete application inventory. Dependencies mapped for key applications. Cloud suitability assessed for migration candidates.
- 4 — Prioritized: Full dependency mapping. 6R strategy assigned to each application. Migration waves planned.
- 5 — Ready: Complete assessment with TCO analysis. Migration roadmap approved. Quick wins identified for early waves.
Key Questions
- Do you have a complete inventory of all applications?
- Are application dependencies mapped?
- Have you assessed each application's cloud suitability?
- Have you assigned a migration strategy (6R) to each application?
- Have you identified applications that should be retired or replaced?
Dimension 2: Data Architecture
Scoring Rubric
- 1 — Unmanaged: No data inventory. Data locations unknown. No data governance.
- 2 — Basic: Partial data inventory. Some data classified. Basic data governance.
- 3 — Managed: Data inventory complete. Data classified by sensitivity. Data governance policies defined.
- 4 — Advanced: Full data lineage. Cloud-compatible data architecture. Data migration plan developed.
- 5 — Ready: Data architecture optimized for cloud. Migration tools selected. Egress costs modeled.
Key Questions
- Do you know where all your data is and how sensitive it is?
- Are there regulatory requirements that restrict where data can be processed?
- How much data needs to be migrated, and how long will it take?
- Have you modeled data egress costs for your cloud architecture?
Dimension 3: Network Infrastructure
Scoring Rubric
- 1 — Not ready: No cloud connectivity. Internet-only access. Insufficient bandwidth for cloud workloads.
- 2 — Basic: VPN connectivity available. Bandwidth adequate for limited cloud use.
- 3 — Functional: VPN or dedicated connectivity. Adequate bandwidth for planned migrations. DNS architecture designed.
- 4 — Advanced: Dedicated connectivity (Direct Connect/ExpressRoute). Redundant connections. Network architecture designed for hybrid cloud.
- 5 — Ready: Optimized hybrid network. Redundant dedicated connections. SD-WAN or equivalent. Full network monitoring.
Dimension 4: Security & Compliance
Scoring Rubric
- 1 — Not ready: No cloud security policies. Compliance requirements for cloud unknown. No identity federation.
- 2 — Developing: Cloud security policies in development. Compliance requirements identified. Identity federation planned.
- 3 — Functional: Cloud security policies defined. Compliance requirements addressed. Identity federation implemented.
- 4 — Advanced: Cloud landing zone with security controls. CSPM deployed. Zero-trust architecture in progress.
- 5 — Ready: Comprehensive cloud security program. CSPM across all environments. Zero-trust implemented. Regular security assessments.
Dimension 5: Organizational Capability
Scoring Rubric
- 1 — No capability: No cloud skills. No cloud operations experience. No training program.
- 2 — Emerging: Some cloud certifications. Limited cloud operations experience. Training in progress.
- 3 — Developing: Cloud-certified team members. Some cloud operations experience. Cloud Center of Excellence forming.
- 4 — Capable: Certified cloud architects and engineers. Cloud operations experience. Cloud CoE active.
- 5 — Ready: Deep cloud expertise across multiple providers. Mature cloud operations. Cloud-first culture.
Dimension 6: Financial Readiness
Scoring Rubric
- 1 — Not ready: No cloud budget. No TCO analysis. No FinOps capability.
- 2 — Basic: Cloud budget allocated. Basic TCO analysis completed. Cost tracking in place.
- 3 — Functional: Detailed TCO analysis. Cloud budget with contingency. Basic FinOps practices.
- 4 — Advanced: Comprehensive TCO model. Reserved capacity strategy. FinOps team or role established.
- 5 — Ready: Mature FinOps program. Chargeback/showback implemented. Continuous cost optimization.
Dimension 7: Governance Maturity
Scoring Rubric
- 1 — No governance: No cloud governance policies. No account structure. No tagging standards.
- 2 — Basic: Basic cloud governance policies. Account structure defined. Tagging standards defined.
- 3 — Functional: Cloud governance policies enforced. Account structure implemented. Tagging enforced by policy.
- 4 — Advanced: Policy-as-code enforcement. Compliance monitoring. Change management for cloud.
- 5 — Ready: Mature cloud governance. Automated compliance. Continuous governance improvement.
Scoring & Next Steps
| Total Score | Readiness Level | Recommended Action |
|---|---|---|
| 7–14 | Pre-foundation | Address critical gaps before any migration activity |
| 15–21 | Foundation building | Build foundation capabilities; limit migration to low-risk applications |
| 22–28 | Pilot-ready | Proceed with controlled pilot migration; address remaining gaps in parallel |
| 29–33 | Migration-ready | Execute migration program; focus on optimization and governance |
| 34–35 | Cloud-mature | Focus on optimization, innovation, and advanced cloud capabilities |
Any dimension scoring 1 is a critical gap that should be addressed before migration, regardless of total score. Security and governance gaps at score 1 create compliance risk that is expensive to remediate after migration.
DCS Global's Cloud Readiness Assessment provides a detailed evaluation of your environment with specific migration recommendations, TCO analysis, and a phased migration roadmap. Contact our cloud architects to schedule an assessment.